L-19 Engine

Overhaul is done!

Christopher and I left Post Mills @ 1:45 and got back home at 9:30, very long day indeed.

Engine looks great (even when shrink-wrapped), now all we have to do is install it.

Oh, and the Blanik has been de-gunked and assembled thanks to Mike, Steve, Tim, Nancy, Tom (and me).

-Andy

20120407-183747.jpg

This entry was posted in Uncategorized. Bookmark the permalink.

1 Response to L-19 Engine

  1. S2 says:

    It looks like something you’d find in your Easter basket.

Comments are closed.